# Block 022 — Phase 1 rates closeout (verification of blocks 001-021) + Phase 1 rates synthesis note

**Status:** ○ queued
**Phase:** Phase 1 (Rates)

## Topic scope

Verification gate for ALL rates items (blocks 001-021). If any rates item is still Weak, next block opens with a rates drill prefix. Write Phase 1 rates synthesis note.

## Plan


**Prerequisite:** Block 00a/00b — verification block re-probes the rubric and anti-patterns as part of closeout. (Block 00c withdrawn 2026-07-02.)
_(Filled at session close of prior block, per 2026-06-23 convention.)_

## Carry-forward to next block

_(Filled at session close.)_
