# Block 079 — Phase 3 verification

**Status:** ○ queued
**Phase:** Phase 3 (Cross-asset)

## Topic scope

Verification gate for cross-asset items (blocks 073-078). Write Phase 3 synthesis.

## Plan

_(Filled at session close of prior block, per 2026-06-23 convention.)_

## Carry-forward to next block

_(Filled at session close.)_
